Centrally based in Crick, Northamptonshire, Eddie Stobart required a cross dock facility in which goods are kept in the condition their clients would expect. WS Temporary Buildings was able to provide them with a commercial temporary building which could be installed quickly so that it didn't interfere with their business.
The 30m x 75m temporary warehouse building has 6 quick action roller shutter doors allowing for 6 lorries to be loaded / unloaded at a time. A secondary large temporary building is utilised for servicing of trailer units. This being a 22m span x 30m long. Both buildings are installed onto an existing concrete and fixed with chemical anchors.

A-Frame & Specifications:
Span: 30.00 metres
Length: 75.00 metres
Eave Height: 6.20 metres
Ridge Height: 11.12 metres
Roof: Thermo Insulated
Wall: 40mm PIR sandwich panel
Roller door: 4.86m x 5.6m electric galvanised
Pedestrian door: 2m x 1m MOE door