top of page

Insulated workshop and warehouse for Ham Baker Site (DMI Group)

Workshop & Warehouse Insulated Building


Having an area in the heart of Stoke on Trent Ham Baker wanted to utilise it for additional storage by adding a temporary storage building. The building will also function as a workshop and in time internal divisions may be added. The insulated building has been installed onto an existing concrete slab and took just 7 working days to complete. This temporary industrial unit from point of order to installation had a turnaround of just 2 weeks.



A-Frame & Specifications:

Span: 15.00 metres

Length: 80.00 metres

Eave Height: 5.20 metres

Ridge Height: 7.74 metres

Roof: Thermo Insulated

Wall: 40mm PIR sandwich panel

Roller door: 4.86m x 4.6m electric galvanised

Pedestrian door: 2m x 1m MOE door



bottom of page