As the height of the initial corona-virus pandemic came upon us, we were contacted by Wiltshire Council to supply temperature-controlled temporary units to be installed at two hospital sites. We acted quickly knowing the critical need for the building and after receiving the go ahead we were able to hand the buildings over within 6 days.
Working under time sensitive conditions and while much of the UK were in lockdown, the crew acted with the upmost professionalism and were able to install the building to meet the requirements of the client. One of which was that the building maintained a temperature of five degrees to comply with the guidelines the council had been given.

A-Frame & Specifications:
Span: 15.00 metres
Length: 25.00 metres
Eave Height: 5.20 metres
Ridge Height: 7.69 metres
Roof: Thermo Insulated
Wall: 40mm PIR sandwich panel
Roller door: 4.86m x 4.60m electric speed doors, operated with induction loops
Pedestrian door: 2m x 1m MOE door

